In a multi-block development, one cost concerns a single block while another concerns every unit (KMK Art. 72). In Yonevo units are kept with their block; block-specific costs are charged only to that block, and the budget and reports come from the same records.
No credit card needed · 14 days free · Cancel whenever you like
Units are kept with their block, land share and floor area; the period balance report groups by block.
The annual budget is prepared line by line and compared with actuals; it is split between units by land share, floor area or equally.
Monthly fees are charged automatically by rule; posting the same period twice is blocked.
The default is the daily method: monthly rate ÷ 30 × days. A month-based method that counts every started month as a full month can also be chosen; the screen notes that it may be disputed.
Shared costs are charged to every unit; a block-specific cost is charged in a separate charge to the units in that block only (equally, by land share or by floor area).
Cash-basis book or double-entry mode; double-entry mode adds the journal, general ledger, subsidiary ledger and trial balance.
Each user is given the modules they work in, with read-only or full access. Permissions are per property and module; there are no separate per-block permissions.
Who changed each record, and when, is tracked; reports are available as PDF or Excel.
Example: a lift repair that concerns only Block B.
No credit card needed. Set everything up around your data and the way you manage.
Other solutions for your role and your buildings